dc.description.abstract | Pavel Šandera:
Projekt stavební části administrativní budovy včetně podrobného položkového rozpočtu a časového harmonogramu postupu prací - Bakalářská práce
VŠB – Technická Univerzita Ostrava, Fakulta stavební, Katedra pozemního stavitelství
2014, 60 stran
Vedoucí bakalářské práce: ing. Zdeněk Peřina, Ph.D.
Předmětem mé bakalářské práce je vytvořit projekt adaptace stávajícího fiktivního objektu skladu na novou administrativní budovu smyšlené firmy Lampa, s.r.o., podrobný položkový rozpočet na danou stavbu a časové harmonogramy prací pro vybranou část budovy.
Součástí projektu je dokumentace bouracích prací a dokumentace stavební části včetně příslušných textových a výkresových částí. Dokumentace slouží pro realizaci výstavby.
Podrobný položkový rozpočet je sestaven pro bourací a pro stavební práce. Je zpracován ve verzi s cenami a s výkazem výměr. Tento rozpočet slouží zejména jako podklad pro investora. Lze jej však upravit na rozpočet slepý, který je možno využít při výběrovém řízení.
Dva časové harmonogramy postupu stavebních prací jsou navrženy pro realizaci přístavby k objektu. Jeden počítá s jednosměnnou výstavbou, druhý počítá s dvousměnnou výstavbou. Harmonogramy jsou určeny jako vodítko pro rozvržení plánovaných nákladů a výnosů v čase, pro operativní řízení výstavby a pro včasné zajištění stavebních materiálů a lidských zdrojů pro jednotlivé etapy realizace. V neposlední řadě mají sloužit jako orientační kalendář pro předávky konstrukčních výztuží technickému dozoru investora před betonáží.
Cílem tohoto projektu je ukázat jednu z možných variant přestavby stávajícího částečně nevyužitého objektu na novou moderní a plně funkční administrativní budovu. Dále má pak ukázat finanční náklady na tuto akci a časovou potřebu pro provedení přístavby k tomuto objektu. | cs |
dc.description.abstract | Pavel Šandera:
Project of a constructional part of an administrative building including a detailed budget and a time schedule of progress of work – Bachelor thesis
VŠB – Technical University of Ostrava, Faculty of Civil Engineering, Building Construction Department 2014, 60 pages
Thesis supervisor: Ing. Zdeněk Peřina, Ph.D.
The objective of the bachelor thesis is a creation of a project of a fictitious storehouse renovation to a new administrative building of a fabricated company Lampa, s.r.o., a detailed budget for this building and a time schedules of work for the selected part of the building.
Part of the project is a documentation of demolishing and building operations including relevant text and drawing documentation. The documentation serves for a realization of the construction.
The detailed budget is drawn up for demolishing and building operations. It is processed in two versions, with prices and with a bill of quantities. This budget serves mainly as a basic document for the investor. It is possible to adjust it to a blind budget with a possible use during a selection procedure.
Two time schedules of progress of work are designed for the realization of an addition to a building. One of them supposes one-shift construction; the other supposes two-shift construction. The schedules are determined to be a guideline for a distribution of planned costs and earnings in time, for operating management of the construction and for timely arrangement of a construction material and human resources for the individual stages of realization. Last but not least, they are supposed to serve as an orientation calendar for handovers of constructional supports to an engineering supervision of the investor before concreting.
The aim of this project is to point out to one of the possible variants of the reconstruction of the partly idle premises to the new modern and fully functional administrative building. It should also point out to the financial charges for this action and a time request for carrying out the addition to the building. | en |
dc.format.extent | 332270 bytes | cs |
dc.format.mimetype | application/pdf | cs |
dc.language.iso | cs | cs |
dc.publisher | Vysoká škola báňská - Technická univerzita Ostrava | cs |
dc.subject | - | cs |
dc.subject | - | en |
dc.title | Projekt stavební části administrativní budovy včetně podrobného položkového rozpočtu a časového harmonogramu postupu prací | cs |
dc.title.alternative | Project construction part of office buildings, including a detailed itemized budget and timetable of workflow | en |
dc.type | Bakalářská práce | cs |
dc.date.accepted | 2014-05-26 | cs |
dc.thesis.degree-name | Bc. | cs |
dc.thesis.degree-level | Bakalářský studijní program | cs |
dc.thesis.degree-grantor | Vysoká škola báňská - Technická univerzita Ostrava. Fakulta stavební | cs |
dc.description.department | 225 - Katedra pozemního stavitelství | cs |
dc.thesis.degree-program | Stavební inženýrství | cs |
dc.thesis.degree-branch | Příprava a realizace staveb | cs |
dc.description.result | velmi dobře | cs |
dc.identifier.sender | S2712 | cs |
dc.identifier.thesis | SAN0024_FAST_B3607_3607R041_2014 | |
dc.rights.access | openAccess | |