dc.contributor.advisor | Jadviščok, Petr | |
dc.contributor.author | Súľovcová, Daniela | |
dc.date.accessioned | 2016-11-02T15:02:29Z | |
dc.date.available | 2016-11-02T15:02:29Z | |
dc.date.issued | 2016 | |
dc.identifier.other | OSD002 | cs |
dc.identifier.uri | http://hdl.handle.net/10084/115384 | |
dc.description | Import 02/11/2016 | cs |
dc.description.abstract | Bachelor thesis is focused on highway construction in engineering geodesy. Surveying work related to bridge building 205-00, which is part of the D1 motorway. It was the height adjustment of the formwork support structure with precision heights setting a focus for implementation. In this work is explained by building the stakeout network with linear structures, there are zoomed location of the structure, methods of position and height of the delimitation used documents and detailed procedure for field performance and the resulting processed data. | en |
dc.description.abstract | Bakalárska práca je zameraná na diaľničnú výstavbu v inžinierskej geodézií. Geodetické práce sa týkali mostného objektu 205-00, ktorý je súčasťou diaľnice D1. Išlo o výškové nastavenie debnenia nosnej konštrukcie pomocou presného výškového vytyčovania a zameranie po realizácii. V bakalárskej práci je vysvetlené budovanie vytyčovacej siete u líniových stavbách, je tu priblížená lokalita stavebného objektu, metódy polohového a výškového vytyčovania, použité podklady a podrobný postup meračských prác a výsledným spracovaním údajov. | cs |
dc.format | 50 l. : il. + 4 příl. + 1 CD-R | cs |
dc.format.extent | 5755153 bytes | |
dc.format.mimetype | application/pdf | |
dc.language.iso | sk | |
dc.publisher | Vysoká škola báňská - Technická univerzita Ostrava | cs |
dc.subject | the supporting structure of the bridge | en |
dc.subject | setting the formwork | en |
dc.subject | stake out a network | en |
dc.subject | implementation of the au- measurement | en |
dc.subject | camber | en |
dc.subject | nosná konštrukcia mosta | cs |
dc.subject | nastavenie debnenia | cs |
dc.subject | vytyčovacia sieť | cs |
dc.subject | porealizačné meranie | cs |
dc.subject | nadvýšenie | cs |
dc.title | Nastavenie a kontrola konštrukcie skruží pri výstavbe mosta 205 stavby D1 Hričovské Podhradie - Litavská Lúčka | sk |
dc.title.alternative | Setting and Checking Construction Centrings During the Construction of the Bridge Construction 205 D1 Hričovské Podhradie - Litavská Lúčka | en |
dc.title.alternative | Nastavení a kontrola konstrukce skruží při výstavbě mostu 205 stavby D1 Hričovské Podhradie - Litavská Lúčka | cs |
dc.type | Bakalářská práce | cs |
dc.contributor.referee | Dandoš, Rostislav | |
dc.date.accepted | 2016-05-31 | |
dc.thesis.degree-name | Bc. | |
dc.thesis.degree-level | Bakalářský studijní program | cs |
dc.thesis.degree-grantor | Vysoká škola báňská - Technická univerzita Ostrava. Hornicko-geologická fakulta | cs |
dc.description.category | Prezenční | cs |
dc.description.department | 544 - Institut geodézie a důlního měřictví | |
dc.thesis.degree-program | Geodézie a kartografie | cs |
dc.thesis.degree-branch | Inženýrská geodézie | cs |
dc.description.result | velmi dobře | cs |
dc.identifier.sender | S2735 | cs |
dc.identifier.thesis | SUL0055_HGF_B3646_3646R007_2016 | |
dc.rights.access | openAccess | |