Zobrazit minimální záznam

dc.contributor.authorLenort, Radim
dc.contributor.authorSamolejová, Andrea
dc.date.accessioned2007-01-09T08:37:10Z
dc.date.available2007-01-09T08:37:10Z
dc.date.issued2007
dc.identifier.citationMetalurgija. 2007, g. 46, br. 1, s. 61-66.en
dc.identifier.issn0543-5846
dc.identifier.issn1334-2576
dc.identifier.urihttp://hdl.handle.net/10084/59579
dc.language.isoenen
dc.publisherHrvatsko Metalurško Društvoen
dc.relation.ispartofseriesMetalurgijaen
dc.relation.urihttp://hrcak.srce.hr/file/9763en
dc.subjectmetallurgy productionen
dc.subjectfloating capacity bottlenecksen
dc.subjectoutput analysisen
dc.subjectTheory of Constraintsen
dc.titleAnalysis and identification of floating capacity bottlenecks in metallurgical productionen
dc.typearticleen
dc.identifier.locationNení ve fondu ÚKen
dc.description.abstract-enThe article constitutes a procedure for the analysis and identification of floating capacity bottlenecks in metallurgical production. The procedure conceived is based on the use of detailed capacity calculations, the output of which is the determination of the hourly output of the floating capacity bottleneck depending on the production schedule. Applying the said procedure is illustrated by the example of output analysis of a line for the cutting of hot rolled bars. Analysis and identification of the floating capacity bottlenecks subsequently becomes the starting point for applying the principles and tools of the Theory of Constraints (TOC) in material flow control in metallurgical plants.en
dc.identifier.wos000242838000010


Soubory tohoto záznamu

SouboryVelikostFormátZobrazit

K tomuto záznamu nejsou připojeny žádné soubory.

Tento záznam se objevuje v následujících kolekcích

Zobrazit minimální záznam