Zobrazit minimální záznam

dc.contributor.authorBriš, Radim
dc.contributor.authorTran, Nuong Thi Thuy
dc.date.accessioned2023-11-16T10:55:31Z
dc.date.available2023-11-16T10:55:31Z
dc.date.issued2023
dc.identifier.citationMathematics. 2023, vol. 11, issue 2, art. no. 320.cs
dc.identifier.issn2227-7390
dc.identifier.urihttp://hdl.handle.net/10084/151746
dc.description.abstractThe aim of this article was to solve a multi-objective maintenance optimization problem by minimizing both unavailability and cost through the use of an optimal maintenance strategy. The problem took into account three different system designs upon which the objective functions are dependent, and the time to start preventive maintenance (PM) was used as a decision variable. This variable was optimized for all system components using a discrete maintenance model that allows for the specification of several discrete values of the decision variable in advance to find the optimal one. The optimization problem was solved using innovative computing methodology and newly updated software in MATLAB, which was used to quantify the unavailability of a complex system represented through a directed acyclic graph. A cost model was also developed to compute the cost of different maintenance configurations, and the optimal configuration was found. The results for a selected real system (a real fluid injection system adopted from references) showed that unavailability was less sensitive to variations in maintenance configurations, while cost variations were more noticeable in relation to different maintenance configurations. Applying PM, the increasing value of the decision variable increased cost because it led to more frequent corrective maintenance (CM) actions, and recovery times due to CM were more expensive than recovery times due to PM.cs
dc.language.isoencs
dc.publisherMDPIcs
dc.relation.ispartofseriesMathematicscs
dc.relation.urihttps://doi.org/10.3390/math11020320cs
dc.rights© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.cs
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/cs
dc.subjectmulti-objective optimizationcs
dc.subjectunavailabilitycs
dc.subjectcostcs
dc.subjectmaintenancecs
dc.subjectacyclic graphcs
dc.subjectalternating renewal processcs
dc.titleDiscrete model for a multi-objective maintenance optimization problem of safety systemscs
dc.typearticlecs
dc.identifier.doi10.3390/math11020320
dc.rights.accessopenAccesscs
dc.type.versionpublishedVersioncs
dc.type.statusPeer-reviewedcs
dc.description.sourceWeb of Sciencecs
dc.description.volume11cs
dc.description.issue2cs
dc.description.firstpageart. no. 320cs
dc.identifier.wos000927585500001


Soubory tohoto záznamu

Tento záznam se objevuje v následujících kolekcích

Zobrazit minimální záznam

© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.
Kromě případů, kde je uvedeno jinak, licence tohoto záznamu je © 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.