Geodetické práce při výstavbě komunikace Přeložka silnice I/7 - I.etapa Chomutov-Křímov

Loading...
Thumbnail Image

Downloads

4

Date issued

Authors

Král, Jan

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

The Bachelor work describes procedure and course of geodetic works during the road construction: Transfer of the road 1/7 – 1.stage Chomutov – Křímov. In the opening part, the work describes locality, setting out net and a survey project documentation. Afterwards, the work describes setting out of the road detail survey points and a control setting out of the detail survey points with the use of polar setting out methods, trigonometric leveling and a levelling from the center between the rods. In the next part, surveying the as-build construction with the use of polar method is described. This is followed by calculations and evaluation of obtained data and their graphic presentation by specialized software. The attached charts of measured values, thematical map, longitudinal and cross sections are the main point of the Bachelor work.

Description

Import 29/09/2010

Subject(s)

setting out net, permitted setting-out deviation, control measurement, levelling from the center between the rods, longitudinal section, cross section

Citation