Vytápění pomocí obnovitelných zdrojů energie v budově pro administrativní využití

Abstract

The topic of the master thesis is a disposition project of the office building. The office building is designed as a separately standing four-floor object. The system of construction is wall with the use of systemic solutions and materials of Wienerberger brand. The capacity of building is supposed to be fifty-eight. The second part of the thesis contains the energy performance of the building, card of energy performance of the building and thermo-technical building requirements. The heating system was designed on the basis of output data. Its source of heat is a biomass boiler. In the third part of the thesis the environmental technology of buildings is detailed. This part solves in detail a design of central heating of object by using of detected values from previous topics.

Description

Delayed publication

Available after

Subject(s)

biomass boiler, administrative purposes, renewable sources of energy, central heating

Citation