Fire risk in MTBF evaluation for UPS system

dc.contributor.authorElia, Stefano
dc.contributor.authorSantantonio, Alessio
dc.date.accessioned2017-01-11T08:45:32Z
dc.date.available2017-01-11T08:45:32Z
dc.date.issued2016
dc.description.abstractThe reliability improvement of no-break redundant electrical systems is the first aim of the proposed strategy. The failure of some UPS (Uninterruptible Power Supply) system may lead to the fire occurrence. The most used electrical configurations are presented and discussed in the paper. The innovation of the proposed method consists of taking into account the fire risk to improve the accuracy of wiring configuration and component’s failure rate. Thorough research on MTBF (Mean Time Between Failure) data has been performed for each wiring component and UPS. The fire risk is taken into account introducing an equivalent fire block in the Reliability Block Diagram scheme; it has an MTBF value calculated form yearly statistics of UPS fire events. The reliability of the most used UPS electrical configurations is evaluated by means of the RBD method. Different electrical systems have been investigated and compared based on MTBF. The importance of fire compartmentation between two or more UPS’ connected in parallel is proved here.cs
dc.format.extent501986 bytes
dc.format.mimetypeapplication/pdf
dc.identifier.citationAdvances in electrical and electronic engineering. 2016, vol. 14, no. 2, p. 189-195 : ill.cs
dc.identifier.doi10.15598/aeee.v14i2.1662
dc.identifier.issn1336-1376
dc.identifier.issn1804-3119
dc.identifier.urihttp://hdl.handle.net/10084/116585
dc.language.isoencs
dc.publisherVysoká škola báňská - Technická univerzita Ostravacs
dc.relation.ispartofseriesAdvances in electrical and electronic engineeringcs
dc.relation.urihttp://dx.doi.org/10.15598/aeee.v14i2.1662cs
dc.rights© Vysoká škola báňská - Technická univerzita Ostrava
dc.rightsCreative Commons Attribution 3.0 Unported (CC BY 3.0)
dc.rights.accessopenAccess
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/
dc.subjectelectrical installationcs
dc.subjectfailure ratecs
dc.subjectfire riskcs
dc.subjectMTBFcs
dc.subjectNo-Break power systemcs
dc.subjectRBDcs
dc.subjectredundant electrical systemcs
dc.subjectreliabilitycs
dc.subjectUPScs
dc.titleFire risk in MTBF evaluation for UPS systemcs
dc.typearticlecs
dc.type.statusPeer-reviewedcs
dc.type.versionpublishedVersioncs

Files

Original bundle

Now showing 1 - 1 out of 1 results
Loading...
Thumbnail Image
Name:
1662-9380-1-PB.pdf
Size:
490.22 KB
Format:
Adobe Portable Document Format
Description:
publishedVersion

License bundle

Now showing 1 - 1 out of 1 results
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: