Optimalizace výrobní linky v konkrétním podniku
Loading...
Downloads
4
Date issued
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
Bachelor thesis deals with optimization of rotors production line no. 165, which was chosen based on OEE analysis. In first part of the thesis, there are characteristics of methods and concepts used in lean manufacturing. Second part contains information about company Brose, its history, customers and products. Third part is focused on analysis of production line using OEE, Value Stream Mapping and measuring times, right at the production line. Fourth part contains suggestions on how to improve the current condition of the line by implementing methods of lean manufacturing and other measures. Methods, that were used are 5S, SMED, TPM and TWI. After that comes evaluation of mentioned suggestions from which can be determined, that successful implementation could lower downtime of the line by 7,83 % and increase productivity by 5,33%.
Description
Import 02/11/2016
Subject(s)
optimization, production line, tool setter, lean manufacturing, logistics, production, changeover, maintenance