Hodnocení vlastností vybraných sanačních omítek
Loading...
Downloads
2
Date issued
Authors
Pater, Ondřej
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
Subject of redevelopment of wet brickwork includes hydro isolation, drying up system and constructional arrangements, which aim is the permanent reduction of the damp in the walls and so at once also achievement of required insulative parameters of constructions and required humidity in the interiors of redeveloping buildings. Summing up we can divide redevelopments to surface working and to these which involve partial interventions to the construction. The elimination of damp can be mostly solved by one adjustment. Usually it is combination of direct and indirect hydro isolative methods in the form of complex redeveloping system. Redeveloping plastering systems belongs to category of indirect redevelopment methods.
This thesis is focused on evaluation and comparison of redevelopment plastering systems with WTA certificate. There were chosen products from three internal companies: SAKRET CZ, LB Cemix Ltd. and Saint-Globain Construction Products CZ plc. On these products were made tests according to requirements of regulation WTA 2-9-04/D.
Description
Import 02/11/2016
Import 20/01/2016
Import 11/02/2016
Import 20/01/2016
Import 11/02/2016
Subject(s)
Remediation system WTA, remediation methods, directive WTA 2-9-04/D, rehabilitation plaster WTA