Speciální doprava a její optimalizace pro realizaci překlizu dobývací technologie při vybavování porubu 402 202 na důlním závodě ČSM Stonava

Abstract

In the diploma thesis I deal with the issue of special transport in equipping the longwall no. 402 202 at the ČSM Stonava mining plant. According to the prepared MTP mine for 2019, the technology was to be equipped with technology from the extracted longwall no. 402 200 located in the adjacent block. However, due to the increased development of CO during the extracted of the longwall face, it was necessary to close the entire face, including the technology. This created a serious problem of providing alternative and currently available technology. As an alternative solution, the use of technology with a dug face No. 402 304/1 was offered. At that moment, the decision on the choice of transport route and optimization of transport for the needs of the equipment of longwall no. 402 202 began. In my work I will focus on the very aspects of decision-making and optimization of both transport route and selected transport and handling equipment. In the end, I evaluate how the equipping action of longwall no. 402 202 turned out with regard to the MTP plan in 2019 and with regard to the implemented election.

Description

Subject(s)

equipment, longwall, special transport, traction and transport equipment, event shift, MTP

Citation