Technické řešení stavby koridoru v kaolinovém lomu Rokle pro přeložku bezejmenného potoka

Abstract

The KERAMOST a.s. company must solve problem with nameless brook water course shifting, which it block a lot of blocked reserves of the kaolin reserved mineral in the Rokle allotment. Mining rule imposes for the mining organization the most effective mineral reserves extracting. KERAMOST Inc. a new plan of the opening, preparing and mining is preparing presently, because present kaolin deposit will soon be mining out. Probably the most suitable solution might be nameless brook watercourse shifting to the present, soon mining out kaolin quarry. The embankment in a quarry mining out area for brook water course will constructed and with a advantage will used all of extracted overburden materials witch occur in the Rokle allotment. The regular dewatering of the kaolin quarry forefield will ensured.

Description

Import 04/07/2011

Subject(s)

raw materials, deposit, kaolin, brook watercourse, dewatering, surface moisture

Citation