Využití výpočtů ustáleného stavu při projektování průmyslové sítě

Loading...
Thumbnail Image

Downloads

5

Date issued

Authors

Král, Martin

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

The objective of this thesis is the use of the calculation of steady-state design of industrial networks Australian underground mine for coal. For correct operation of industrial networks is necessary to know the voltage fluctuations, the network load, power factor and other values at different stages of industrial networks. These values must be complied within prescribed limits, otherwise the industrial network operator penalized. To understand the problems of steady states in industrial networks are presented in the thesis theoretical analysis of this issue. To calculate the steady state industrial network is used program Bizon Designer 4.42 build 398, the calculation results of the program are compared in the program DIgSILENT PowerFactor. In conclusion of the thesis are the results of the calculation of steady states.

Description

Import 05/08/2014

Subject(s)

underground coal mine, steady state, RET650, Bizon projektant 4.42 build 398, DIgSILENT PowerFactor

Citation