Využití důlních vod v rámci lomu Bílina

Abstract

In the assiged degree work i will work at the solution of the problems of utilisation of mining underground water withing the bounds of the Bilina coal quarry. The work is concentrated an the Albert locality drainage where coal and some overburden exhausts shall be lead in the future. The work will be concentrated on the dewatering of the albert area and creating a detention reservoir within its nearness. All water from aiming field will be concentrated in this reservoir and finally it will be utilized for the sprinking of transport routes and belt conveyers of the coal draw – off. The afflux wather will be conducted over overburden face to the quazzy bottom.

Description

Subject(s)

coal draw-offs, drainage, detention reservoir, Bilina Mine

Citation