Náhradní způsob ukládání VEP z EPC na VUAS po roce 2020
Loading...
Downloads
3
Date issued
Authors
Potůček, Gustav
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
This thesis presents, alternative solutions alternative form of storage VEP from EPC to VUAS after 2020. The proposed implementation of the VEP store, which is on the site VUAS transported from the mine railway EPC, the loading on the DPD 1200 mm with subsequent selection of transport DPD series TC1 and TC2. The material will then deposited on dump sites VUAS economy.
Description
Import 22/07/2015
Subject(s)
spillage ramp, telescopic heads, mining train, telpher transportation