Náhradní způsob ukládání VEP z EPC na VUAS po roce 2020

Loading...
Thumbnail Image

Downloads

3

Date issued

Authors

Potůček, Gustav

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

This thesis presents, alternative solutions alternative form of storage VEP from EPC to VUAS after 2020. The proposed implementation of the VEP store, which is on the site VUAS transported from the mine railway EPC, the loading on the DPD 1200 mm with subsequent selection of transport DPD series TC1 and TC2. The material will then deposited on dump sites VUAS economy.

Description

Import 22/07/2015

Subject(s)

spillage ramp, telescopic heads, mining train, telpher transportation

Citation