Polohopisné zaměření základního okruhu hlubinného dobývání v bočních svazích lomu ČSA

Abstract

The planimetric measurement of the basic air circuit there is the main goal within project „Mining out of the part lignite deposits under of ČSA open pit mine final slopes by underground mining method”. Fundamental horizontal mine points were surveyed using closed traverse. The description of the ČSA open pit mine and mining plan there is content of Thesis first part. The following parts of thesis explain the coordinates (X, Y) of points’ measurement and calculation. The conclusion consists of measurement accuracy assessment under regulation ČBÚ No.435/1992 Coll.

Description

Import 02/11/2016

Subject(s)

mine surveying, horizontal datum S-JTSK, traverse, underground mining, open pit

Citation