Návrh způsobu plánu sanace a rekultivace kamenolomu Mra č (DP Mrač ev.č. DP 7 0303) v návaznosti na zákon č. 185/2001 Sb., o odpadech a změně některých dalších zákonů, v platném znění
Loading...
Downloads
0
Date issued
Authors
Urban, Marcel
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
The content of the dissertation was to create a way of plan of rehabilitation and reclamation of the pit quarry Mrach. The first part I focus on the characteristics of a quarry in terms of location, geology, hydrogeology, mining and transport, refining disintegrated rock. I also follow up with the issue of Act No. 185/2001 Coll. as amended, and other legislation related to the storage of inert materials into the mined area quarry. The main work is to describe individual rehabilitation and reclamation works, which are designed to cover the tracks of quarrying, mining damaged or restore the area to its original state and integrate it into the surrounding landscape. In conclusion, there are calculated the estimated costs of remediation and reclamation and finally evaluated the proposed solution from an environmental point of view.
Description
Import 05/08/2014
Subject(s)
quarry Mrač, law, decree, rehabilitation and reclamation, storage, inert material, forest cover