The evaluation of efficiency of the use of machine working time in the industrial company – case study
Loading...
Downloads
8
Date issued
Journal Title
Journal ISSN
Volume Title
Publisher
De Gruyter
Location
Signature
License
Abstract
In the paper the evaluation of efficiency of the use of machines in the selected production company was presented. The OEE method (Overall Equipment Effectiveness) was used for the analysis. The selected company deals with the production of tapered roller bearings. The analysis of effectiveness was done for 17 automatic grinding lines working in the department of grinding rollers. Low level of efficiency of machines was affected by problems with the availability of machines and devices. The causes of machine downtime on these lines was also analyzed. Three basic causes of downtime were identified: no kanban card, diamonding, no operator. Ways to improve the use of these machines were suggested. The analysis takes into account the actual results from the production process and covers the period of one calendar year.
Description
Subject(s)
effectiveness, OEE analysis, machines and devices
Citation
Management Systems in Production Engineering. 2017, vol. 25, issue 4, p. 241-245.
Item identifier
Collections
Publikační činnost VŠB-TUO ve Web of Science / Publications of VŠB-TUO in Web of Science
OpenAIRE
Publikační činnost Centra energetických jednotek pro využití netradičních zdrojů energie (9370)
Publikační činnost Katedry metalurgie a slévárentví / Publications of Department of Metallurgy and Foundry (618)
Publikační činnost Katedry neželezných kovů, rafinace a recyklace / Publications of Department of Non-ferrous Metals (637)
OpenAIRE
Publikační činnost Centra energetických jednotek pro využití netradičních zdrojů energie (9370)
Publikační činnost Katedry metalurgie a slévárentví / Publications of Department of Metallurgy and Foundry (618)
Publikační činnost Katedry neželezných kovů, rafinace a recyklace / Publications of Department of Non-ferrous Metals (637)