Báňské řešení postupu kolejového zakladače ZD 2100 s návazností na kolesové rýpadlo K 800 v letech 2013 – 2022

Loading...
Thumbnail Image

Downloads

3

Date issued

Authors

Gažík, Ladislav

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

The aim of this thesis is to design a solution of mining track loaders ZD 2100/ Z 73 that will throughout its lifetime till 2022 post overburden materials of wheel excavator K – 800 / K54. It will be releasing coal reserves for future quarry technology in the mining area Slatinice and will be developing a construction readiness for the construction of engineering networks that are connected to the issue which is the entrance of the quarry Vršany to area of Hořanského energy corridor. The solution of mining process stackers is divided into three periods between the years 2013 and 2022.

Description

Import 26/06/2013

Subject(s)

slatinická dump, energy corridor, engineering network, track throwers, storey, EIA

Citation