Báňské řešení postupu kolejového zakladače ZD 2100 s návazností na kolesové rýpadlo K 800 v letech 2013 – 2022
Loading...
Downloads
3
Date issued
Authors
Gažík, Ladislav
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
The aim of this thesis is to design a solution of mining track loaders ZD 2100/ Z 73 that will throughout its lifetime till 2022 post overburden materials of wheel excavator K – 800 / K54. It will be releasing coal reserves for future quarry technology in the mining area Slatinice and will be developing a construction readiness for the construction of engineering networks that are connected to the issue which is the entrance of the quarry Vršany to area of Hořanského energy corridor. The solution of mining process stackers is divided into three periods between the years 2013 and 2022.
Description
Import 26/06/2013
Subject(s)
slatinická dump, energy corridor, engineering network, track throwers, storey, EIA