Projektování silnoproudých rozvodů a systému řízení čerpacích stanic
Loading...
Downloads
1
Date issued
Authors
Šerjeník, Jan
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
The aim of this bachelor thesis is to design power distribution in the pumping station and get to know the extent of creating documentation for the building permit application and construction, to be developed for implementation of these distributions. The proposed powerline connection include low-voltage pumping stations, water pumps, three-phase asynchronous motors, remote control and data indicating the status of the pumping station, icluding security against unauthorized intrusion. The following are the calculations of basic parameters on the basis of the proposed pumps to draw water into the waste water treatment plants and basic technical information, including technical solutions for low voltage connections and the technical solution pumping station. Draft power lines will be drawn using the software ePlan P8 and AutoCAD, in accordance with current legislation.
Description
Import 04/07/2011
Subject(s)
pumping station, connection of low voltage, waste water treatment plant, ePlan P8, AutoCAD