Rekonstrukce rozvodného zařízení průmyslového objektu.

Abstract

Today, emphasis is placed on the fault-free status of electrical equipment in production lines. Power failure and Tim disorders due to inteeuptions in prodution, the manufacturer may cause considerable financial losses. My thesis drala with the reconstrution of an industrial building with Honeywell Aerospace Olomouc Inc. based in Hlubočky. I assessed the current state of wiring in this building. After evaluating the current state of the electrical installation, I suggested two options for the partial reconstrution of substations TR6 and faktory building DV1. Of the two options was chosen on efor which I developed a simplified project documentation.

Description

Import 19/10/2011

Subject(s)

elektrical, elektroval busbar, cable, budbar, fuse, budvar systém, switch boards

Citation