Stavebně technologický postup provádění pochůzné střechy bytového domu

Loading...
Thumbnail Image

Downloads

4

Date issued

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

Postředník, M. Constructional and technological proces of implementing walk (flat) proofed roof of residential building. Ostrava: VŠB – Technical University of Ostrava, Faculty of Civil Engineering, Department od Building Constructions, 2018. Supervisor of bachelor thesis: Ing. Filip Čmiel, Ph. D. This bachelor’s thesis focuses on construction and technical process of implementing walk (flat) proofed roof of the residential house. The residential house has three floors, on the fourth floor is superstructure with stairwell, one room and three parts of the roof construction. One of this part is roof construction designed as a implementing walk (flat) roof and this part deals with the bachelor thesis. Implementing walk (flat) roof is designed from a system track DEKROOF 10-A. Part of the bachelor's thesis is also the project documentation for the implementation of buildings, the item budget of the construction work, the time schedule of the construction of the part and the project of the construction equipment.

Description

Subject(s)

walkable roof, flat roof, residental building, the tiles on washers

Citation