Stavebně technologická studie zadaného objektu
Loading...
Downloads
4
Date issued
Authors
Kleka, Jakub
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
The subject of this thesis is making of technological procedures, drawings, čems budgets and schedule row for 3 variants of ceiling structures for the specifik block of flats. A study and technical report of specified building with dimensions of 16.98 x 15.68 m is also included. The building is designed as a thirdstorey with a cellar.
The first ceiling construction is Porotherm, which consists of POT joists, ceiling insertions Miako and concrete C 20 / 25.
The second ceiling construction is filigree ceiling, which consists of filigree prefabricated ceiling board with spatial armature and concrete C 20 / 25.
The third ceiling is Spiroll, which consists of concrete prefabricated lightened panel and joint grout.
In conclusion, the comparison and evaluation of the most appropriate ceiling for the specified block of flats will be made.
Description
Import 26/06/2013
Subject(s)
ceiling, Porotherm, Filigran, Spiroll, technological process