Stavebně technologická studie zadaného objektu

Loading...
Thumbnail Image

Downloads

4

Date issued

Authors

Kleka, Jakub

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

The subject of this thesis is making of technological procedures, drawings, čems budgets and schedule row for 3 variants of ceiling structures for the specifik block of flats. A study and technical report of specified building with dimensions of 16.98 x 15.68 m is also included. The building is designed as a thirdstorey with a cellar. The first ceiling construction is Porotherm, which consists of POT joists, ceiling insertions Miako and concrete C 20 / 25. The second ceiling construction is filigree ceiling, which consists of filigree prefabricated ceiling board with spatial armature and concrete C 20 / 25. The third ceiling is Spiroll, which consists of concrete prefabricated lightened panel and joint grout. In conclusion, the comparison and evaluation of the most appropriate ceiling for the specified block of flats will be made.

Description

Import 26/06/2013

Subject(s)

ceiling, Porotherm, Filigran, Spiroll, technological process

Citation