Stabilizace stavební jámy v oblasti rekonstruované části Vodního díla Morávka
Loading...
Downloads
4
Date issued
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská – Technická univerzita Ostrava
Location
Signature
Abstract
This thesis deals with the modelling of the stabilisation measures of the construction pit in the area of the reconstructed part of the Morávka Waterworks. The first part deals with the modelling and analysis of the designed part, where microriders, ground anchors and spacers are used. The second part deals with an alternative design in the form of reinforced concrete piles with a large axial distance in combination with ground anchors. The Plaxis software, which is based on the finite element method, is used for modelling.
Description
Subject(s)
ground anchors, microriders sheeting, contiguous pile wall, FEM