Metodika optimalizace obnovy vedení 110 kV
Loading...
Downloads
0
Date issued
Authors
Humlíček, Ondřej
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
This thesis purpose was to establish renovation order for individual maintenance sections of 110 kV lines in the distribution area of Moravia. This was achieved through a metodology that works on the princiles of reliability centered maintenance which takes into consideration both the technical condition of equipement and its importance. This approach allows more efficiently direct flow of funds for repairs. Thesis in its conclusion contains tables of technical condition, the importance of lines and renewal priority for each maintenance section in the distribution area.
Description
Import 22/07/2015
Subject(s)
RCM, reliability, maintenance, renovation priority, technical condition, importance of the line.