Metodika optimalizace obnovy vedení 110 kV

Loading...
Thumbnail Image

Downloads

0

Date issued

Authors

Humlíček, Ondřej

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

This thesis purpose was to establish renovation order for individual maintenance sections of 110 kV lines in the distribution area of Moravia. This was achieved through a metodology that works on the princiles of reliability centered maintenance which takes into consideration both the technical condition of equipement and its importance. This approach allows more efficiently direct flow of funds for repairs. Thesis in its conclusion contains tables of technical condition, the importance of lines and renewal priority for each maintenance section in the distribution area.

Description

Import 22/07/2015

Subject(s)

RCM, reliability, maintenance, renovation priority, technical condition, importance of the line.

Citation