Bachelor thesis is focused on highway construction in engineering geodesy. Surveying work related to bridge building 205-00, which is part of the D1 motorway. It was the height adjustment of the formwork support structure with precision heights setting a focus for implementation. In this work is explained by building the stakeout network with linear structures, there are zoomed location of the structure, methods of position and height of the delimitation used documents and detailed procedure for field performance and the resulting processed data.

Description

Import 02/11/2016

Subject(s)

the supporting structure of the bridge, setting the formwork, stake out a network, implementation of the au- measurement, camber