Zaměření skutečného provedení železničního spodku při revitalizaci trati Frýdlant nad Ostravicí – Valašské Meziříčí

Abstract

This dissertation describes real survey of Ral Construction in revitalizing the Railway Frydlant nad Ostravici – Valašské Meziříčí. Second part describe theoretic aspect of measure real execution of Ral Construction. Binding rules, norms and regulation connected with filed measure for completing geodetic documentation. In the third part I focus on construction site SO 03-16-01. Where I describe Railway dot field and his completion during the field measure, expanse of construction site and illustration of measured area. In fourth part I described methods, measure and equipment that I used for completing Ral Construction. Conclusion of this dissertation was fabrication 3D model of Ral Construction. Part of the geodetic documentation is design Ral Construction.

Description

Import 02/11/2016, PDF DP je nahráno v příloze

Subject(s)

rall construction substructure, survey of the actual execution, Railway Infrastructure Administration, railway point field, temporary station

Citation