Optimalizace provozu malé vodní elektrárny.

Loading...
Thumbnail Image

Downloads

1

Date issued

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

This master thesis deals with optimizing the operation of small hydropower plant located on the river Bela in Jesenik district. Hydroelectric plant has been renovated in 2014 and the main target of this thesis is to find possibilities, how to increase amount of produced energy. In the first part is explained what the water energy is and how hydroelectric plant works. In the next part we find detailed information about each part of hydroelectric plant. Main part of this Master thesis is focused on research of current conditions. On the basis of this research have been chosen four variants of optimizing. The last section is devoted to multi-criteria analysis, by which is selected the best variant of optimization.

Description

Import 03/11/2016

Subject(s)

Hydroelectric power, small hydro power plant, water turbine, asynchronous generator, reconstruction, current conditions, multi-criteria analysis, investment costs, net present value, payback period, Fuller's triangle, Saaty's method, weighted sum approach.

Citation