Projekt modernizace technologie 110/22/6 kV v rozvodně R8/III Hulváky
Loading...
Downloads
0
Date issued
Authors
Besta, Václav
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
In my thesis proposal for upgrading the existing electrical equipment in substations of 110 kV and 22 kV substations R8/III - Hulváky (OS_E803). After the initial introduction to the issues addressed by the analysis of the current facility in terms of functionality and an assessment of the current situation. The next step is to design variations of electrical equipment, in which I acted in accordance with the methodology in-house distribution company CEZ, as In the next chapter estimated the necessary time and progress of activities related to modernization of existing equipment. The conclusion is summarized and evaluated the benefits of proposed solutions.
Description
Import 04/07/2011
Subject(s)
Switching station, busbar, switch, disconnecting switch, analysis, schedule of activities, upgrading technology, dispatching control