Kvalitativní a ekonomické dopady zkrácení doby míchání stavebních směsí

Loading...
Thumbnail Image

Downloads

5

Date issued

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

The subject of this thesis is the issue of planning and capacity management with focus on capacity of the production equipment. Characteristics, analysis and utilization of production capacity. The main goal is to analyze whether it is possible to shorten the period of mixing selected cement mixtures and thus increase productivity of production equipment without reducing the quality of material and the effect of this reduction from an economic point of view.

Description

Import 02/11/2016

Subject(s)

Capacity, capacity of production equipment, cement mixture

Citation