Otvírka příprava a dobývání sloje 24 v západní části 11. kry závodu ČSA Dolu Karviná se zaměřením na dvojí použití chodeb
Loading...
Downloads
8
Date issued
Authors
Sabela, Ota
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
This thesis addresses the opening, preparation and extraction 24th seam middle bridge in the western part of the 11th floes sites CSA Mine Karvina with a focus on dual-use corridors. It deals with the geological characteristics of the area in question, designing appropriate technologies punching a series of measures contributing to effective stabilization of overburden corridors intended for another use in the exploitation of secondary longwall. In this work I propose technology for longwall mining including safety management system of ventilation in the area. In conclusion, I deal with the evaluation and comparison of my design with commonly used method.
Description
Import 26/06/2013
Subject(s)
opening mines, preparatory mines, coal seam exploitation