Absolvování individuální odborné praxe

Loading...
Thumbnail Image

Downloads

1

Date issued

Authors

Tománek, Roman

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

ÚK/Sklad diplomových prací

Signature

200903534

Abstract

During the winter und summer half I pass 50days university practice and in this time I from beginning familiarized with processes of firm Elektropohony s.r.o. At first I operated in electric workshop where I acquainted with single components of switchboards, assembly and connection from drawing documentation. My final task of this practice was: design switchboard for ski-lift and sequentially connect it up and prove. My project solves speed regulation of ski-lift drive, whereas motor is fed from frequency convertor V1000-VZA4011 FAA. This solution gives the higher comfort of ski-lift operation, because enables continuous run-up, after-running und continuous adjustable speed. Frequency convertor saves asynchronous motor against overload and together with other instrumentation is situated in switchboard 1RM11. Connection diagram is mentioned in drawing documentation.

Description

Subject(s)

current circuit breaker, Elektropohony s. r. o., frequency convertor, programmable relay, ski-lift, switchboard, drive, PC-schematic, connection diagram, circuit breaker

Citation