Potenciál návratnosti malé vodní elektrárny na řece Dyji

Loading...
Thumbnail Image

Downloads

4

Date issued

Authors

Bartůněk, Lukáš

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

This bachelor thesis deals with water management and hydroelectric solution of machinery and electrical parts of small hydropower plant. There is a proposal of mechanical and electrical part of small hydropower plant for concrete run-off curve. On the basis of the measured and calculated data was chosen a suitable type of turbine. The work included design solutions for a variant with Banki and Kaplan turbine. For both versions are calculated installed capacity and the amount of electricity produced. At the end are intended investment costs and payback periods.

Description

Import 26/06/2013

Subject(s)

Small hydropower plant, Banki turbine, Kaplan turbine

Citation