Stochastic optimization of laboratory test workflow at metallurgical testing centers
Loading...
Downloads
4
Date issued
Journal Title
Journal ISSN
Volume Title
Publisher
Hrvatsko Metalurško Društvo
Location
Signature
Abstract
The objective of the paper is to present a way to shorten the time required to perform laboratory tests of materials
in metallurgy. The paper finds a relation between the time to perform a test of materials and the number of technicians
carrying out the test. The relation can be used to optimize the number of technicians. The approach is based
on probability theory, as the amount of material to be tested is unknown in advance, and uses powerful modelling
techniques involving the generalized estimating equations.
Description
Subject(s)
metallurgy, laboratory test, testing time, dependent data, generalized linear model
Citation
Metalurgija. 2016, vol. 55, no. 4, p. 779-782.