Geodetické sledování sesuvného území

Abstract

Objective of work consists of observing the state of landslide areas in building cement plants and appraisal whether it shift of observed points. The work contains two phases of measurement. The basic phase of measurement was realized on April 2nd in 2009 a the second phase of measurement on April 1st in 2010. The least squares method was used for the evaluation of results. The primary result of work is numerical and graphical evaluation of measured positional changes of the observed points and recommendation, whether it is necessary to continue to monitoring the slope.

Description

Import 11/07/2012

Subject(s)

landslide, phase measurement, a linear least squares, numerical and graphical evaluation, monitoring

Citation