Výstavba uhelného odtahu na hnědouhelném povrchovém dole

Loading...
Thumbnail Image

Downloads

1

Date issued

Authors

Zuzčaková, Jaromíra

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

This bachelor work deals with the topic of development of new face line in the brown coal mine Doly nástup Tušimice – locality Libouš II - north. Its main aim is determination of suitable direction of new face line and building of long distance belt transporter deck. The work is aimed at the locality introduction – geological characteristics of exklusive deposit and geographical location. I tis followed by introduction of individual technological parts of mining methods and description of particular mining method used in the quarry Libouš DP Tušimice. This method is described in chronological order from the original status to the new solutions of coal withdrawal building . It was necessary to implement new solution to preserve minimal annual production of energetic coal and supplies for power plants Prunéřov I and II, Tušimice I. and Chvaletice, where the annual coal output for all these customers reaches 11 mil. tons of coal.

Description

Import 05/08/2014

Subject(s)

long distance belt transport, wheel excavator, wheel, technological parts, belt conveyor

Citation