Vytyčení a zaměření skutečného provedení stavby mostního objektu č.209 v úseku Nemčice – Čierne Klačany
Loading...
Downloads
1
Date issued
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
The theme of this thesis is
„Setting-out and Measurement of Realization of Construction
of Brigde.“
In my thesis there are a description of the bridge construction, content
of surveying, used aids to location and surveying methods. The brigde is located on the
road between Nemčice and Čierne Kľačany on the Slovakia.
The measurement was taken in the Datum of Uniform Trigonometric Cadstral Network and the Baltic Vertical Datum.
Description
Import 11/07/2012
Subject(s)
bottom bridgework, top bridgework, setting-out