Analýza provozních stavů větrných elektráren

Loading...
Thumbnail Image

Downloads

6

Date issued

Authors

Veselý, Miroslav

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

The aim of this study was first to describe the synchronous generator driven by permanent magnets. Measurements to assess short, short, and when connected to a resistance properties. Also review the warming machine, that there is a breach of isolation. After examining the properties of the generator to determine if the generator is suitable for connection to distribution networks, and if it satisfies the requirements of the standard. It was then necessary to examine the effectiveness of individual sections of the generator itself in opposition to connect to the network. The next item was review of power quality, meets the 3% limit signal distortion. In the first use of intermediate signal quality was poor and unsuitable for connection to the distribution network. Then use the ideal-link (WindyBoy), using this circuit, the quality has reached the level that was no longer suitable for connection to the network.

Description

Import 29/09/2010

Subject(s)

efficiency system, power quality, network of autonomous, synchronous generator with permanent magnets

Citation