Quarry Vršany - Šverma is the only prospective coal quarry in the North Bohemian brown coal basin primarily because it is not territorially restricted by legislative ecological limits. This circumstance also means that the quarry can be operated up to about 2052.
The area is divided in the direction of South to North by a pillar of linear textures (hořanský energy corridor) into two distinctive parts in both the mining process and in terms of legislation.
For mining quarry Vršany - Šverma to the set boundaries up to hořanský corridor, mining activity is permitted by the state administration (OBU Most) in accordance to POPD of quarry Vršany - Šverma, the advance to the energy corridor.
For further mining of quarry Vršany in the pillar of hořanský corridor a new early development plan must be processed, as well as a preparation plan and an extraction plan, including a study of the environmental impact of the construction. Strict environmental limits for noise and dust and keeping protection zones of pipelines primarily towards the city Most, to which the quarry will come closer in the future, means, that the deployment of excavators is being considered for excavating dump slatinice. This also blocks the supply of coal. The prospective mining of the excavator will prepare the area for the relocation of existing utility networks of hořanský corridor and subsequent smooth entry of excavator KU 800 into the area.