Methodology of end-to-end control of compliance with piping models (Piping) and technological schemes (P&ID) at all stages of the project
| dc.contributor.advisor | Wernerová, Eva | |
| dc.contributor.author | Ambuchi, Allan Odera | |
| dc.contributor.referee | Knap, Jiří | |
| dc.date.accepted | 2026-06-04 | |
| dc.date.accessioned | 2026-09-02T14:22:31Z | |
| dc.date.available | 2026-09-02T14:22:31Z | |
| dc.date.issued | 2026 | |
| dc.description.abstract | This diploma thesis examines the processes for ensuring end-to-end consistency between Process and Instrumentation Diagrams (P&IDs) and 3D piping models in industrial engineering, with a specific focus on the Autodesk Plant 3D ecosystem. To test these methodologies, a "Discharging Tank" system was modelled based on an authentic P&ID. The study intentionally introduced two specific modelling errors: the omission of a manual valve (HA-116) and the assignment of an incorrect pipeline specification (100HC01 in place of the required CS150). By systematically running all native Plant 3D validation tools, the research evaluated how effectively these discrepancies were detected and categorized their impact by severity. Derived from these experimental findings, the thesis proposes a structured quality-control framework. This approach establishes formal validation milestones at the 30%, 60%, and 90% design phases, as well as the final Issued-for-Construction (IFC) stage, detailing specific roles, required outputs, and success metrics for each. The work culminates in a practical, sequential validation checklist intended for immediate use by professionals managing active Plant 3D projects. | en |
| dc.description.abstract | Tato diplomová práce zkoumá metodiku komplexní (end-to-end) kontroly souladu mezi technologickými schématy (P&ID) a trojrozměrnými potrubními modely (Piping) ve všech fázích průmyslového inženýrského projektu, s primárním zaměřením na softwarové prostředí Autodesk Plant 3D. Jako experimentální základ byl použit řízený testovací projekt, systém výpustné nádrže (Discharging Tank) modelovaný podle skutečného P&ID vytvořeného v AutoCAD Plant 3D. Do 3D modelu byly záměrně vneseny dvě kategorie chyb: chybějící ruční ventil (HA-116) a nesprávná klasifikace potrubí (100HC01 namísto v P&ID předepsané CS150). Všechny dostupné validační mechanismy v rámci Plant 3D byly systematicky spuštěny, výsledky analyzovány a nesrovnalosti klasifikovány podle závažnosti. Na základě těchto experimentálních poznatků byla vyvinuta etapová metodika kontroly kvality, která definuje konkrétní validační kontrolní body při 30%, 60% a 90% rozpracovanosti modelu a při milníku Issued-for-Construction (IFC). Závěrem práce je komplexní podrobný validační kontrolní seznam určený k přímému použití na skutečných projektech Plant 3D. | cs |
| dc.description.department | 222 - Katedra městského inženýrství | cs |
| dc.description.result | výborně | cs |
| dc.format.extent | 2293521 bytes | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.other | OSD002 | |
| dc.identifier.sender | S2712 | |
| dc.identifier.thesis | AMB0040_FAST_N0732A260030_2026 | |
| dc.identifier.uri | http://hdl.handle.net/10084/159557 | |
| dc.language.iso | en | |
| dc.publisher | Vysoká škola báňská – Technická univerzita Ostrava | cs |
| dc.rights.access | openAccess | |
| dc.subject | P&ID | en |
| dc.subject | Piping | en |
| dc.subject | AutoCAD Plant 3D | en |
| dc.subject | BIM | en |
| dc.subject | validation methodology | en |
| dc.subject | consistency checking | en |
| dc.subject | quality control | en |
| dc.subject | Discharging Tank | en |
| dc.subject | pipe specification | en |
| dc.subject | valve | en |
| dc.subject | tag management | en |
| dc.subject | P&ID | cs |
| dc.subject | potrubí | cs |
| dc.subject | AutoCAD Plant 3D | cs |
| dc.subject | BIM | cs |
| dc.subject | validační metodika | cs |
| dc.subject | kontrola souladu | cs |
| dc.subject | řízení kvality | cs |
| dc.subject | výpustná nádrž | cs |
| dc.subject | specifikace potrubí | cs |
| dc.subject | ventil | cs |
| dc.subject | správa tagů | cs |
| dc.thesis.degree-grantor | Vysoká škola báňská – Technická univerzita Ostrava. Fakulta stavební | cs |
| dc.thesis.degree-level | Magisterský studijní program | cs |
| dc.thesis.degree-name | Ing. | |
| dc.thesis.degree-program | Stavební inženýrství - BIM inženýring | cs |
| dc.title | Methodology of end-to-end control of compliance with piping models (Piping) and technological schemes (P&ID) at all stages of the project | en |
| dc.title.alternative | Metodika komplexní kontroly souladu potrubních modelů (Piping) a technologických schémat (P&ID) ve všech fázích projektu. | cs |
| dc.type | Diplomová práce | cs |
| local.files.count | 6 | |
| local.files.size | 3014063 | |
| local.has.files | yes |
Files
Original bundle
1 - 5 out of 6 results
Loading...
- Name:
- AMB0040_FAST_N0732A260030_2026.pdf
- Size:
- 2.19 MB
- Format:
- Adobe Portable Document Format
- Description:
- Text práce
Loading...
- Name:
- AMB0040_FAST_N0732A260030_2026_zadani.pdf
- Size:
- 153.91 KB
- Format:
- Adobe Portable Document Format
- Description:
- Zadání
Loading...
- Name:
- AMB0040_FAST_N0732A260030_2026_priloha.rar
- Size:
- 157.66 KB
- Format:
- RAR
- Description:
- Příloha
Loading...
- Name:
- AMB0040_FAST_N0732A260030_2026_posudek_vedouci_Wernerova_Eva.pdf
- Size:
- 156.49 KB
- Format:
- Adobe Portable Document Format
- Description:
- Posudek vedoucího – Wernerová, Eva
Loading...
- Name:
- AMB0040_FAST_N0732A260030_2026_posudek_oponent_Knap_Jiri.pdf
- Size:
- 177.18 KB
- Format:
- Adobe Portable Document Format
- Description:
- Posudek oponenta – Knap, Jiří