Technologický postup provádění montovaných stropů
Loading...
Downloads
2
Date issued
Authors
Hurban, Peter
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
The subject of this bachelor thesis is the technological procedure of placing prefabricated ceilings over the floors of a three-story block of flats with a partial cellar structure underneath. The ceiling structure will be designed in the Heluz Miako system, which constitutes of ceramic ceiling block and ceramic-concrete ceiling beams reinforced by bracing. Part of the thesis is also the project documentation in the extent for a building permit, appropriate technical drawing documentation including construction details of the ceiling structures and an evaluation of the thermal qualities of the object and its particular details. Apart from a technological procedure carried out in the technological and executive part, a check list of the execution, a time schedule of the construction, its total budget and the itemized budget of the ceiling structures are dealt with as well.
Description
Import 26/06/2013
Subject(s)
technological process, ceiling structure, project documentation, time schedule, itemized budget, ceiling beam, ceramic block