Vybudování úložiště litého granulátu, dobývací prostor doly Bílina

Loading...
Thumbnail Image

Downloads

2

Date issued

Authors

Štolová, Kateřina

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

In my thesis I deal with the structure that meets the requirements of Act 61/1988 Sb., to perform mining activities. Construction solves the storage space in the inner dump Mine Bílina SD a.s. The storage site will serve for depositing cast granulate, which is a energetic by-product, that is produced in neighboring plant Ledvice. My thesis focuses on the implementation of alternative solutions that dump. The first part describes the characteristics of the area concerned, energy by-products and their storage conditions. The next part deals with the construction of cast granulate storage in the original projection and by the variant solution. Followed by, evaluation of each variant. The aim is to achieve the desired amount of storage capacity with minimal economic cost.

Description

Import 26/06/2013

Subject(s)

energy by-products, cast granulate, storage space, inner dump Mine

Citation