Primární kolektor Brno - vestavba nosného ostění v TG4
Loading...
Downloads
10
Date issued
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
The untility tunnel is an underground passage linear construction, which is used to store pipe or cable utilities. The aim of this thesis is the design and review of the New supporting lining and of the remedial measures in the field of technical galleries. Individual chapters are focused to familiarization with collectors, history collectors in Brno, their condition survey, design of the rehabilitation measures in TG4, with the design and review of the New supporting lining and then evaluation of the chosen method of solving.
Description
Import 13/01/2017
Subject(s)
The untility tunnel, rehabilitation, lining, shotcrete, a mathematical model