Zefektivnění výroby ve výrobním podniku
Loading...
Downloads
0
Date issued
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
The aim of the thesis is the Streamline of Production in a Manufacturing Company CBG Impex s. r . o., based in Valašské Meziříčí. The author suggested the company to implement 5S method . The enterprise decided to establish methods in individual steps . After the introduction of the method was in the engineering department achieved savings , which is described in more detail in the practical part . Since the company deals with the production of the piece was not possible to calculate the annual savings . The theme for follow-up work could be the introduction of the 5S method for other departments in the company .
Description
Import 02/11/2016
Subject(s)
Manufacturing; logistics; lean manufacturing; 5S method; Kaizen, MUDA, saving.