Zaměření pilířů měřické pozorovatelny IGDM

Loading...
Thumbnail Image

Downloads

8

Date issued

Authors

Squerzi, Vojtěch

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

The aim of my Bachelor was horizontal measurement of the six pillars and vertical measurement of leveling pin mark newly refurbished observatory IGDM a horizontal and vertical orientation newly ulit surveying points in the survey corridor. All the surveyed objects are within the VSB-TU Ostrava. Was measured by geodetic methods. Data were calculated and drawn in the position of S-JTSK a vertical systém Bpv. Calculation of coordinates was carried out in the Groma v8.0 and Microsoft Excel 2007, the drawing was drawn in AutoCAD 2008. The result of my observation measurements for the horizontal coordinates of the pillars and vertical coordinate pin marks, for measurements in the corridor are the horizontal and vertical coordinates of observation points.

Description

Import 05/08/2014

Subject(s)

horizontal, vertical, coordinates

Citation