Přetěžení území po přeložce Hořanského koridoru z důvodu postupu lomu Vršany

Loading...
Thumbnail Image

Downloads

5

Date issued

Authors

Polášek, Jiří

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoká škola báňská - Technická univerzita Ostrava

Location

Signature

Abstract

This work solves one of the much preparatory work which is necessary to do before the subsequent transition of the mining technology of the Vršanská coal into the Hořanský energy corridor. It is the area in which pipelines with streaming raw materials strategically important for the whole our country are laid, the high-voltage cables, the road Trebusice - Bylany and the railway siding owned by the Vršanská coal. After moving of utilities to the new position it is necessary to annihilate the old network in the existing area and to do the remining of this area. The way of remining, the designed transport and the area with moved mined soils including the economic balance sheet of the proposed solution is the focus of this work.

Description

Import 11/07/2012

Subject(s)

Horanský energy corridor, utilities, and Vršanská coal, pipeline, coal reserves

Citation