Implementace upínacích systému pro TZB metodou BIM
Loading...
Files
Downloads
8
Date issued
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská – Technická univerzita Ostrava
Location
Signature
Abstract
The thesis deals with the design of clamping systems for HVAC with subsequent use of the BIM method. Specifically, the thesis deals with the design of clamping systems for pipelines that are routed through underground collector. It is a monolithic reinforced concrete collector, which is part of the newly designed wastewater treatment plant, where the collector designed for this treatment plant connects the individual construction objects. The design of the clamping systems is created in Autodesk Revit. The thesis includes a BIM project management plan. This plan includes in particular the project work schedule, BEP (BIM Execution Plan), time and financial estimation. The aim of the thesis is to verify the applicability of the BIM method for this purpose, i.e. for the design and implementation of fixture systems for HVAC ductwork.
Description
Subject(s)
BIM, HVAC, clamping systems, BEP, underground collector, pipelines, wastewater treatment plant, IFC