Provozní odvodnění povrchového lomu Vršany při jeho dalším postupu do dobývacího prostoru Slatinice v létech 2025 - 2050
Loading...
Downloads
9
Date issued
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
The objective of this thesis is to draft a method of operational drainage at the Vršany surface quarry during its further spreading into the Hořany energy corridor in the Slatinice mining area in years 2025 – 2050. Furthermore, the work suggests a definitive location for the main pumping plant and the route of the delivery conduit from the main pumping station in Vršany to the drainage water treatment plant.
Subsequently, the thesis describes the contemporary state of drainage at the Vršany surface quarry, its hydrogeological conditions, geological structure as well as its history.
Description
Subject(s)
main pumping station, drainage, surface quarry, mining, coal, mine water treatment, Vršany