Vodní hospodářství dolu Svornost a možnosti využití důlních vod jáchymovského revíru

Abstract

The Svornost mine is last operatated mine od Jachymov mining disctrict. Currently, the Svornost mine is maintained and dewatered due to radon water pumping possible for the needs of Jáchymov spa resorts. Most of mine waters in the western part of the Jáchymov mining district are drained across the mining field of the Svornost mine. The diploma thesis looks for possibilities of reducing the power consumption in pumping from deep level to the level of gravity mine water dreinage gallery. As a precaution, it was proposed to repair sealing on the level of gravity drainage and, after evaluating this repair, to gradually upgrade the pumping station. In the next part of the thesis are considered various possibilities of utilization of the mine water of Jáchymov mining district for energy purposes. The possibility of a micro hydroelectric power plant in the incline on the new drainage gallery Svornost by Küh ore vein seems to be promising. The potential of overflow of radon spa waters and mine water from the Kozlí (Bock) gallery also seems interesting.

Description

Subject(s)

mining, mine water management, mine dewatering, pumping, economy, water energy, storage of energy, Svornost mine, Jáchymov, Czech republic.

Citation