Technologický postup výstavby Severní hráze - lom Bílina
Loading...
Downloads
4
Date issued
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoká škola báňská - Technická univerzita Ostrava
Location
Signature
Abstract
Diploma thesis deals with technological process of Northern dam construction of storage cast granulate in inner part of the spout of Bílina quarry. Working with the introduction of the origin and the origin of energy by-products in the process of burning fossil fuels in power plants due to the reduction of air pollution limits associated with the process of desulphurization and their potential in the use of alternative building materials. The diploma thesis describes in detail the characteristics of the area affected by mining and discusses issues related to the proposed solution. In another part of the work describes the current state of the site. Following is a description of the proposed solution in the form of a comprehensive technological progress of the construction of the dam North repository cast granulate using additive granulate. In the final part of the thesis evaluates the technical - economic and economic benefits of the proposed solution.
Description
Import 02/11/2016
Subject(s)
secondary energy product, agglomerate, certified building product, fly ash, slag, doped granulate, stabilized, soil, humus layer, topsoil, subsoil