Studie rekonstrukce zavaleného úseku tunelu Jablunkov

Abstract

The bachelor thesis deal with individual methods reinstating of tunnel Jablunkov, which has been realized after the accident. Specific retrieval describe break down tunnel of november 2009, the introduction reinstating of tunnel and planning parameters „protective construction“ of computing program GEO5. The bachelor thesis discribe complicated history, geologic and geotechnic conditions service area, which make more difficult design and realization of new railway tunnel Jablunkov.

Description

Import 04/07/2011

Subject(s)

methods reinstating, protective construction, geotechnic conditions

Citation